Details
Production process:
through the point film machine, the guide cloth is fixed on the front and back of the ABS guide plate, and then the filter film is fixed on the front and back of the guide plate. This will cover the diversion membrane filter cloth and the semi-finished products into the flat membrane welding machine of the mold cavity production operators hands start button, hot die down to heat welding, welding time is rising and hot die (membrane is uniform weld around the perimeter of the guide plate) and the whole counter automatic welding position - > operator to take out the products, and the diaphragm to turn over a face - production operation personnel the diaphragm in the flat membrane welding machine of the mold cavity production operators hands start button, Hot die down to heat welding, welding time is rising and hot die (membrane is uniform weld around the perimeter of the guide plate) to the bedplate automatically launch welding position, operators take out after welding products.
Note: a complete sheet film welding cycle is completed within 50 seconds.
through the point film machine, the guide cloth is fixed on the front and back of the ABS guide plate, and then the filter film is fixed on the front and back of the guide plate. This will cover the diversion membrane filter cloth and the semi-finished products into the flat membrane welding machine of the mold cavity production operators hands start button, hot die down to heat welding, welding time is rising and hot die (membrane is uniform weld around the perimeter of the guide plate) and the whole counter automatic welding position - > operator to take out the products, and the diaphragm to turn over a face - production operation personnel the diaphragm in the flat membrane welding machine of the mold cavity production operators hands start button, Hot die down to heat welding, welding time is rising and hot die (membrane is uniform weld around the perimeter of the guide plate) to the bedplate automatically launch welding position, operators take out after welding products.
Note: a complete sheet film welding cycle is completed within 50 seconds.